[CRISP-TEAM] Review Committee
Alan Barrett
apb at cequrux.com
Thu Jan 8 13:44:19 CET 2015
In response to the comment from Paul that the ReviewCommittee section
contains too much detail, I propose thefollowing changes:
1. Delete the sentence about frequency of review.
2. Delete the paragraph about number of members.
3. Retain everything else, which includes text about openness and
transparency which was not in the first draft.
CURRENT:
[[[
III.A.4. Establishment of a Review Committee
To ensure the service level defined in the proposed contract
is maintained and provided by the IANA functions operator, the
NRO EC will conduct periodic reviews of the service level of
the IANA number resource functions that serves each RIR and
their respective communities. Such reviews shall be conducted at
some time during the last twelve (12) months of the term of the
proposed contract or its successors, or at any time on request
from the Boards of at least two (2) of the RIRs, and shall in any
case be conducted not less than once every three (3) years.
The NRO EC shall establish a Review Committee that will advise and
assist the NRO EC in its periodic review. The Review Committee
will, as needed, undertake a review of the level of service
received from the IANA functions operator and report to the
NRO EC any concerns regarding the performance of the IANA
functions operator, including especially any observed failure
or near-failure by the IANA functions operator to meet its
contractual obligations under the proposed contract. Any such
Review Committee will advise the NRO EC in its capacity solely to
oversee the performance of the IANA number resource functions and
the Review Committee’s advice and comment will be limited to the
processes followed in the IANA functions operator’s performance
under the proposed contract. Activities of the Review Committee
shall be conducted in an open and transparent manner. Reports from
the Review Committee shall be published.
The Review Committee should be a team composed of three (3)
suitably qualified representatives from each RIR region. Within
each RIR region, one (1) of the Review Committee members shall
be appointed by the Board of the RIR, and two (2) of the members
shall be selected via an open, accessible, documented and
transparent procedure by the community of the RIR. This is similar
to the way members of the NRO NC are appointed or selected, and it
is expected that each RIR will develop its own procedures for this
purpose.
]]]
PROPOSED:
[[[
III.A.4. Establishment of a Review Committee
To ensure the service level defined in the proposed contract
is maintained and provided by the IANA functions operator, the
NRO EC will conduct periodic reviews of the service level of
the IANA number resource functions that serves each RIR and
their respective communities.
The NRO EC shall establish a Review Committee that will advise and
assist the NRO EC in its periodic review. The Review Committee
will, as needed, undertake a review of the level of service
received from the IANA functions operator and report to the
NRO EC any concerns regarding the performance of the IANA
functions operator, including especially any observed failure
or near-failure by the IANA functions operator to meet its
contractual obligations under the proposed contract. Any such
Review Committee will advise the NRO EC in its capacity solely to
oversee the performance of the IANA number resource functions and
the Review Committee’s advice and comment will be limited to the
processes followed in the IANA functions operator’s performance
under the proposed contract. Activities of the Review Committee
shall be conducted in an open and transparent manner. Reports from
the Review Committee shall be published.
]]]
We will also have to explain to the community taht we chose not to
go into much detail.
--apb (Alan Barrett)
More information about the CRISP
mailing list