[CRISP-TEAM] Review Committee changes

Izumi Okutani izumi at nic.ad.jp
Wed Jan 7 07:27:33 CET 2015


Thank you Alan. This looks good to me.

I thought the way you re-structured the paragraph made it easier to read
with concept first then details.

I also liked where you placed to move the  "Appointment of a different
contractor". It does make it less contradictory than placing under no
change in operartor.

Thanks Alan for incorporating my feeback.


Izumi


On 2015/01/07 15:16, Alan Barrett wrote:
> On Wed, 07 Jan 2015, Izumi Okutani wrote:
>> Suggested text:
>>
>> 1. Added the part marked in *
>>
>> ---
>> The NRO EC shall establish a Review Committee that will advise and
>> assist the NRO EC in its periodic review. *Review Committee selection
>> and process willl be conducted in an open and transparent manner.*
>> ---
> 
> I made several editorial changes in this area, mostly related to 
> changing the order of sentences, to keep the composition of the review 
> committee separate from the activities of the review committee.
> 
> I have added "Activities of the Review Committee shall be conducted in 
> an open and transparent manner."  I already had "two (2) of the members 
> shall be selected via an open, accessible, documented and transparent 
> procedure by the community of the RIR".
> 
> I have not added a requirement for each RIR Board to use an open and 
> transparent process in appointing their one member, because the 
> corresponding process for the NRO NC does not have such a requirement 
> (see section 7 of the MoU which created the NRO, 
> <https://www.nro.net/documents/nro-memorandum-of-understanding>).
> 
> New text:
> 
> [[[
> Establishment of a Review Committee
> 
> To ensure the service level defined in the proposed contract is 
> maintained and provided by the IANA functions operator, the NRO EC will 
> conduct periodic reviews of the service level of the IANA number 
> resource functions that serves each RIR and their respective 
> communities.  Such reviews shall be conducted not less than once every 
> three (3) years, and more frequently on request from the Boards of at 
> least two of the RIRs.
> 
> The NRO EC shall establish a Review Committee that will advise and 
> assist the NRO EC in its periodic review.  The Review Committee will, as 
> needed, undertake a review of the level of service received from the 
> IANA functions operator and report to the NRO EC any concerns regarding 
> the performance of the IANA functions operator, including especially any 
> observed failure or near-failure by the IANA functions operator to meet 
> its contractual obligations under the proposed contract.  Any such 
> Review Committee will advise the NRO EC in its capacity solely to 
> oversee the performance of the IANA number resource functions and the 
> Review Committee���s advice and comment will be limited to the processes 
> followed in the IANA functions operator���s performance under the 
> proposed contract.  Activities of the Review Committee shall be 
> conducted in an open and transparent manner.  Reports from the Review 
> Committee shall be published.
> 
> The Review Committee should be a team composed of three (3) suitably 
> qualified representatives from each RIR region.  Within each RIR region, 
> one (1) of the Review Committee members shall be appointed by the Board 
> of the RIR, and two (2) of the members shall be selected via an open, 
> accessible, documented and transparent procedure by the community of the 
> RIR.  This is similar to the way members of the NRO NC are appointed or 
> selected, and it is expected that each RIR will develop its own 
> procedures for this purpose.
> ]]]
> 
>> 2. Moved  text from "Appointment of a different contractor"" in the
>>   last parahgraph and added the part marked in *
>>
>> ---
> [...]
>> * While there is no concrete needs nor plan at this point,* if the NRO
>> EC determines *in the future* that the IANA functions related to number
>> resources should be transferred to a different contractor, then
>> selection of a new contractor shall be conducted in a fair, open and
>> transparent process, in line with applicable industry best practices and
>> standards.  Associated requests for proposals, responses, and the
>> contract itself, shall be published.
>> ---
> 
> I moved that paragraph as you suggested, and made minor editorial
> changes.
> 
> New text (a new paragraph at the end of "Contract and Service level 
> agreement with the IANA functions operator on number resources", just 
> before "Establishment of a Review Committee"):
> 
> [[[
> While there are no concrete needs or plans at this point, the NRO EC may 
> in the future determine that the IANA functions related to number 
> resources should be transferred to a different contractor. In such a 
> case, selection of a new contractor shall be conducted in a fair, open 
> and transparent process, in line with applicable industry best practices 
> and standards.  Associated requests for proposals, responses, and the 
> contract itself, shall be published.
> ]]]
> 
> I attach a .docx file with change tracking.
> 
> --apb (Alan Barrett)
> 
> 
> _______________________________________________
> CRISP mailing list
> CRISP at nro.net
> https://www.nro.net/mailman/listinfo/crisp
> 





More information about the CRISP mailing list