[CRISP-TEAM] Review Committee changes
Alan Barrett
apb at cequrux.com
Wed Jan 7 07:16:37 CET 2015
On Wed, 07 Jan 2015, Izumi Okutani wrote:
>Suggested text:
>
>1. Added the part marked in *
>
>---
>The NRO EC shall establish a Review Committee that will advise and
>assist the NRO EC in its periodic review. *Review Committee selection
>and process willl be conducted in an open and transparent manner.*
>---
I made several editorial changes in this area, mostly related
to changing the order of sentences, to keep the composition of
the review committee separate from the activities of the review
committee.
I have added "Activities of the Review Committee shall be
conducted in an open and transparent manner." I already had "two
(2) of the members shall be selected via an open, accessible,
documented and transparent procedure by the community of the RIR".
I have not added a requirement for each RIR Board to use an open
and transparent process in appointing their one member, because
the corresponding process for the NRO NC does not have such a
requirement (see section 7 of the MoU which created the NRO,
<https://www.nro.net/documents/nro-memorandum-of-understanding>).
New text:
[[[
Establishment of a Review Committee
To ensure the service level defined in the proposed contract is
maintained and provided by the IANA functions operator, the NRO
EC will conduct periodic reviews of the service level of the
IANA number resource functions that serves each RIR and their
respective communities. Such reviews shall be conducted not less
than once every three (3) years, and more frequently on request
from the Boards of at least two of the RIRs.
The NRO EC shall establish a Review Committee that will advise
and assist the NRO EC in its periodic review. The Review
Committee will, as needed, undertake a review of the level of
service received from the IANA functions operator and report to
the NRO EC any concerns regarding the performance of the IANA
functions operator, including especially any observed failure
or near-failure by the IANA functions operator to meet its
contractual obligations under the proposed contract. Any such
Review Committee will advise the NRO EC in its capacity solely to
oversee the performance of the IANA number resource functions and
the Review Committee’s advice and comment will be limited to the
processes followed in the IANA functions operator’s performance
under the proposed contract. Activities of the Review Committee
shall be conducted in an open and transparent manner. Reports
from the Review Committee shall be published.
The Review Committee should be a team composed of three (3)
suitably qualified representatives from each RIR region. Within
each RIR region, one (1) of the Review Committee members shall
be appointed by the Board of the RIR, and two (2) of the members
shall be selected via an open, accessible, documented and
transparent procedure by the community of the RIR. This is
similar to the way members of the NRO NC are appointed or
selected, and it is expected that each RIR will develop its own
procedures for this purpose.
]]]
>2. Moved text from "Appointment of a different contractor"" in the
> last parahgraph and added the part marked in *
>
>---
[...]
>* While there is no concrete needs nor plan at this point,* if the NRO
>EC determines *in the future* that the IANA functions related to number
>resources should be transferred to a different contractor, then
>selection of a new contractor shall be conducted in a fair, open and
>transparent process, in line with applicable industry best practices and
>standards. Associated requests for proposals, responses, and the
>contract itself, shall be published.
>---
I moved that paragraph as you suggested, and made minor editorial
changes.
New text (a new paragraph at the end of "Contract and Service
level agreement with the IANA functions operator on number
resources", just before "Establishment of a Review Committee"):
[[[
While there are no concrete needs or plans at this point, the NRO
EC may in the future determine that the IANA functions related to
number resources should be transferred to a different contractor.
In such a case, selection of a new contractor shall be conducted
in a fair, open and transparent process, in line with applicable
industry best practices and standards. Associated requests for
proposals, responses, and the contract itself, shall be published.
]]]
I attach a .docx file with change tracking.
--apb (Alan Barrett)
-------------- next part --------------
A non-text attachment was scrubbed...
Name: CRISP IANA PROPOSAL Draft with Review Committee issues 20150107-redline.docx
Type: application/octet-stream
Size: 29544 bytes
Desc: not available
URL: <https://www.nro.net/pipermail/crisp/attachments/20150107/31725329/CRISPIANAPROPOSALDraftwithReviewCommitteeissues20150107-redline.docx>
More information about the CRISP
mailing list